Melbourne's Metro Tunnel is set to open in 2025, a year ahead of schedule, and will create capacity for trains to run constantly from the Cranbourne/Pakenham lines through to the Sunbury line.Â
Premier Jacinta Allan and Transport Infrastructure Minister Danny Pearson visited State Library station on Sunday to share that crews successfully ran test trains two minutes apart between West Footscray and Hawksburn stations.Â
Crews have clocked over 16,500 kilometres running through the tunnels since July – paving the way to begin trial operations with drivers and station staff by year's end.
The Metro Tunnel will connect the busy Sunbury, Cranbourne and Pakenham lines through a new tunnel under the city, creating an end-to-end rail line from the north-west to the south-east – freeing up space in the City Loop and creating capacity to run more trains more often.
We're running test trains every 2 minutes in the Metro Tunnel — just turn up and go 🚇 🚇— Jacinta Allan (@JacintaAllanMP) April 7, 2024
Premier Jacinta Allan said the turn-up-and-go services was an exciting prospect.Â
"Test trains are now running on new signalling tech, and we're getting ready to deliver turn-up-and-go transport services that will change the way our city moves forever," she told reporters on Sunday.Â
Minister for Transport Infrastructure Danny Pearson said Victoria's growing population meant projects like this were needed.Â
"We absolutely need to make these sorts of investments, because we know that Victoria's population is just getting bigger and bigger, and by the 2050s, Melbourne will have a population the size of London," he told reporters.Â
"We're a global city and we need to make sure we've got the infrastructure that matches our size, our scale and our breadth"
Public Transport Users Association spokesman Daniel Bowen called  for the government to invest and commit to run all Metro lines frequently.
"Anything less is a missed opportunity," he posted on X (formerly Twitter).Â
To make the most of the investment, and make public transport a viable choice for more trips, the govt needs to commit to run all Metro lines frequently all day, every day.— Public Transport Users Association (@ptua) Anything less is a missed opportunity.Read more: https://t.co/eeBYSbo2W6 (Paywall) pic.twitter.com/fB0a1Ey8hHApril 6, 2024
When directly asked about the timing of trains on the Metro line, Ms Allan said the government was still working through timetabling and would not commit to two minute services.
The idea of two-minute train services has been floated before, with social media users designing some clever parodies with two minute noodle packets.
The bill to Victorian taxpayers for the tunnel has blown out from the initial $11 billion cost, after the state government and consortium each agreed to pay $1.37 billion more in 2020 - an even split of an extra $2.74 billion in costs.
Another $281 million in COVID-related payments was tacked on in May, taking the total taxpayer cost to $12.6 billion.